Thursday, November 10, 2011

Deck Repaired & Secured

The back stairs were removed and railed off. A wall was put in place just past the front door.

The deck is now secured for my grandson's use. See the slider on the left, he can use it to come in and out at will.


Monday, November 7, 2011

Sunday, November 6, 2011

The Start of Flooring Going Down

Saturday November 5th, 2011


and the end of the flooring going down by current installer.


Flooring Moved Into the House

to acclimate...

Lumber Liquidators Tukwila, WA


Picking Up Flooring @ Lumber Liquidators Tukwila, WA

When L.L. Employee Patrick was finished loading, another employee came out to then have me sign a waiver releasing them of any responsibility of problems that may arise from hauling 2.6 tons of 3/4" solid oak hardwood flooring. Previous to the loading, they told me it was perfectly safe to do so.


My back tires looked like they might pop...lol